EasyManua.ls Logo

Avaya MCC1 - Page 263

Avaya MCC1
874 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
SI Installation and Upgrades 263
June 2004
2 Behind control cabinet A of the single-carrier EPN:
Install the same kind (either 9823-A or 9823-B) of lightwave transceiver on cable
connector at slot 2A01.
Connect the fiber-optic cable, coming from control cabinet A of the PPN, to the 9823-type
lightwave transceiver at slot 2A01.
Delicately attach the fiber-optic cable (with cable ties) to the rear covers of the EPN stack.
Coil up the surplus length of fiber-optic cable, and place the coil either in the cable
manager or on the bottom shelf (holding the power supply) of the PPN cabinet.
3 Behind control cabinet B of the single-carrier PPN:
Install a 9823-type lightwave transceiver on the connector at slot 1B01.
Connect one end of a fiber-optic cable to the 9823-type lightwave transceiver at slot 1B01.
Route the fiber-optic cable from the 9823-type lightwave transceiver to the cabinet’s cable
tray and downward out of the cabinet to the EPN stack.
Delicately attach the fiber-optic cable (with cable ties) to the wall of the cable tray at the
built-in cable-tie positions.
4 Behind port cabinet B of the single-carrier EPN:
Install the same kind (either 9823-A or 9823-B) of lightwave transceiver on cable
connector at slot 2B02.
Connect the fiber-optic cable, coming from control cabinet B of the PPN, to the 9823-type
lightwave transceiver at slot 2B02.
Delicately attach the fiber-optic cable (with cable ties) to the rear covers of the EPN stack.
Coil up the surplus length of fiber-optic cable, and place the coil either in the cable
manager or on the bottom shelf (holding the power supply) of the PPN cabinet.

Table of Contents

Other manuals for Avaya MCC1

Related product manuals