Release 9si/10si/Communication Manager 1.x to Communication Manager 2.1
Task list: R9si/10si/Communication Manager 1.x to Communication Manager 2.1
56 SI Installation and Upgrades
June 2004
Verify software version
Return to Task List
Standard Reliability
1 Type list configuration software-version and press Return.
High or Critical Reliability
1 Type list configuration software-version long and press Return.
All
2 Check the Memory Resident field to verify that it shows the correct software load.
Return to Task List
Power up DEFINITY LAN Gateway system
Return to Task List
1 Log on to the DEFINITY LAN Gateway.
2 From the main menu, select Maintenance > Reset System > Reboot System.
Return to Task List
Power up DEFINITY AUDIX system
If the AUDIX was removed from the cabinet
Return to Task List
1 Re-install the AUDIX and allow it to boot up automatically.
2 Check for AUDIX System errors.
3 If the AUDIX remained in the cabinet but the cabinet was powered down:
4 Reseat the AUDIX.
5 Power up the cabinet.
6 The AUDIX reboots automatically.
7 Check for AUDIX System errors.