EasyManua.ls Logo

Avaya MCC1 - All; Check Customer Options [From G3 V4]; High or Critical Reliability; Restore Busyouts [From G3 V4]

Avaya MCC1
874 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G3iV4 to Avaya Communication Manager
Task List: G3iV4 to Avaya Communication Manager
86 SI Installation and Upgrades
June 2004
5 Type list signaling-group and press Enter. For each signal, execute status signal <number>.
Validate that all the signal groups that should be operational are in service.
6 Execute the following commands and verify that the information is correct:
list station
list trunk-group
list hunt-group
list data-module
For upgrades from systems later than G1, list ars analysis
For a system with Expert Agent later than G3V3,
list agent
7 For duplicated systems only, execute status system 1
Return to Task List
Check customer options [from G3V4]
Return to Task List
High or Critical Reliability
1 Verify that the switches are in auto: Type status system 1 and press Enter.
Verify that conditions are normal (this can take as long as 5 to 10 minutes). If the system refuses
to go onto a normal condition, refer to the maintenance procedures; if that fails, escalate the
problem.
All
1
Type display system-parameters customer-options and press Enter.
Check that the
G3 version: field is V11.
Restore busyouts [from G3V4]
Return to Task List
1 Restore any busyouts that you removed in the Verify system status [from G3V4] section prior to
the upgrade.

Table of Contents

Other manuals for Avaya MCC1

Related product manuals