EasyManua.ls Logo

Avaya MCC1 - Installing the Stratum 3 Clock; Task List: Install the Stratum 3 Clock; Install and Position Stratum 3 Clock Cabinet; Unpack and Inspect Stratum 3 Clock Cabinet

Avaya MCC1
874 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the Stratum 3 Clock
Task List: Install the Stratum 3 clock
SI Installation and Upgrades 693
June 2004
Installing the Stratum 3 Clock
Use this task list to install a Stratum 3 clock.
Task List: Install the Stratum 3 clock
1 Unpack and Inspect Stratum 3 Clock Cabinet on page 693
2 Install and Position Stratum 3 Clock Cabinet on page 693
3 Connect AC Power to Stratum 3 Clock Cabinet on page 694
4 Check and Connect Commercial AC Power on page 694
5 Connect DC Power and Ground to Stratum 3 Clock Cabinet on page 694
6 Connect Clock Cabinet Grounding on page 694
7 Connect Stratum 3 Clock DC Power on page 695
8 Set the Clock Options on page 695
9 Cable the Stratum 3 Clock on page 696
10 Install the Stratum 3 Clock Wiring on page 698
Unpack and Inspect Stratum 3 Clock Cabinet
Return to Task List
1 Check the status of the SHOCKWATCH and/or TILTWATCH indicators on the cardboard
container. If the container has been jarred or tilted beyond specifications, the indicators are red,
indicating possible damage.
2 Remove all packing material.
3 Remove front door and rear screw-on panels from the cabinet.
4 Inspect the cabinet for damage. Report any damage per local instructions.
Install and Position Stratum 3 Clock Cabinet
Return to Task List
Check the location of the AC power receptacle. The receptacle must be on a separately fused circuit that
is not controlled by a wall switch. It must be located within 10 ft (3 m) of the cabinet and should be
located outside the MDF area.
1 Position the clock cabinet in the designated location.
2 If earthquake protection is required, skip to Install Earthquake Protection for SCC or Install
Earthquake Protection for MCC.
3 If earthquake protection is not required, level the cabinets and adjust and lock the cabinet
stabilizing bolts to keep the cabinet from moving.

Table of Contents

Other manuals for Avaya MCC1

Related product manuals