EasyManua.ls Logo

Avaya MCC1 - Page 280

Avaya MCC1
874 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
280 SI Installation and Upgrades
June 2004
Return equipment to MSL [75 XE upgrade]
Return to Task List
Return the system equipment replaced during the upgrade to Avaya according to:
In general, return old equipment and crash kits to the MSL, and return ordered but unused
equipment to the Denver factory.
If you are returning heavy equipment such as a cabinet, the project manager should arrange for
Avaya personnel to pick up the equipment.
Tag the returned equipment appropriately.
The replaced System 75 equipment includes:
System 75 control cabinet, control circuit packs, and RMSS tape drive
System 75 TN741 (or international TN419A) tone-clock circuit pack if replaced
R1V3 tape cartridges
TDM cables and AHF103 cable adapters
TDM cables and AHF103 cable adapters
AHF1 TDM bus terminators
Lower rear cover for expansion control cabinet
Return to Task List
Methods and Procedures for Basic Material Returns

Table of Contents

Other manuals for Avaya MCC1

Related product manuals