EasyManua.ls Logo

Avaya MCC1 - Page 286

Avaya MCC1
874 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
286 SI Installation and Upgrades
June 2004
28 Enable customer option and alarm origination [75 small upgrade] (You identify the upgrade as R7
or R8 here.)
29 Verify the upgrade [75 small upgrade]
Restore any customer-placed busy-outs before you run the acceptance tests!
30 Run acceptance tests [75 small upgrade]
31 Readminister translation [75 small upgrade] if necessary
32 Rerecord announcements [75 small upgrade]
33 Save announcements and translation [75 small upgrade]
34 Register the upgraded switch [75 small upgrade]
35 Return equipment to MSL [75 small upgrade]
Verify the required hardware for a control-carrier replacement [75 small upgrade]
Return to Task List
The equipment in the following table must be on-site before the upgrade begins. Ensure that the
translation memory card is current and, if necessary, contains enough memory for recorded
announcements.
The TSC cannot source equipment for you.
To place a claim for missing equipment as part of the Streamlined Implementation process, call 1-800-
772-5409 and respond to the call prompter, or call the number provided by your Avaya representative.
Required hardware, small System 75 control-carrier upgrade to R8si
Description Equipment Quantity
Enhanced Control Carrier J58890AH 1
TN790B Processor 108595638 1
TN765 Processor Interface 103557187 1 or 2 (Note 1)
TN794 Network Control (depends on control carrier) 103557476 1
TN768 Tone-Clock
TN780 Tone-Clock
TN2182 Tone-Clock
103557211
or
103557336
or
106706955
1
1 (Note 5)
1 (Note 6)
631DB1 Power Supply 106432602 1
982LS Current Limiter 106455504 1
ZAHF4 TDM/LAN Bus Terminator 103960456 2
WP91716 L6 TDM/LAN Cable J58890A L20 1 (Note 2)

Table of Contents

Other manuals for Avaya MCC1

Related product manuals