Installation
Installing the Control Unit
2-7
8. Fasten the carrier to the modules by using the
two #4 screws included with the carrier (see
Figure 2-6).
Figure 2-6. Fastening the 2-Slot
Carrier
9. Insert the 3-1/2 inch #8 screw into the bottom of
the modules (see Figure 2-7). Tighten it until
the mounting tracks of the PARTNER ACS
processor module are flush against the wall. Do
not overtighten or the module will warp. Then
go to the next procedure, “Labeling Jacks” on
page 2-9.
Figure 2-7. Tightening the Bottom
Screw