EasyManua.ls Logo

COBHAM SAILOR 900 - Chapter 3 Installation

COBHAM SAILOR 900
245 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98-150471-A02 3-1
Chapter 3
Installation
Installation 3
This chapter is organised in the following sections:
• Unpacking
• Site preparation
• Installation of the ADU
• Installation of the ACU
• Installation of the VMU
3.1 Unpacking
3.1.1 What’s in the box
ADU
Unpack your SAILOR 900 VSAT High Power ADU and check that the following items are
present:
• ADU with 4 lifting brackets (already mounted)
• Package with bolts, washers and cable glands (2 sizes)
ACU
Unpack your SAILOR ACU VSAT KU a and check that the following items are present:
• 1 x Ethernet cable (2 m)
• 1 x Ethernet cable (short)
•Power cable (230 VAC)
• 2 x 75 Ohm coax cables F-F (1m), for Rx and Tx
• NMEA multi-connector
• Installation manual
SAILOR900HP.book Page 1 Monday, July 18, 2016 12:44 PM

Table of Contents