Installation
3-5
3.3. Unpacking
There are 2 packages for Brivo OEC 715/785/865 Mobile C-Arm X-ray Product. One is for C-
Arm (L
×
W
×
H=2000mm
×
900mm
×
1995mm. And the other is Workstation (L
×
W
×
H=1015mm
×
900mm
×
2150mm).
Before unpacking, inspect the shipping enclosure /boxes for damage and report to the
shipper if available.
The unpacking of the system should be done before moving it into the operation room, in order to check
if there’s damage or non-apparent damage occurred during transportation.
The packages should be examined minutely during installation to avoid missing parts with small
dimensions or envelopes containing screws, washers, etc. Once damage is observed, notify service of the
transportation and insurance company immediately.
If non-apparent damage due to transportation was found during unpacking or installation, take the
same action in 15 days after delivery. The transportation corporation will not pay for non-apparent
damage generally unless making an application for inspection in 15 days after delivery.
If damage is discovered, contact the related company immediately, with specifying the type of
apparatus, the serial number and the order number if possible, and describing the nature of the damage.
Please follow the steps below to unpack the Brivo OEC 715/785/865 Mobile C-Arm X-ray Product.
3.3.1. Shipping Container Inspection
Inspect the shipping container for damage.
Describe the state of the shipping container in below: