Installation
3-73
3.8. Installation Check List
Brivo OEC 715/785/865 Installation Checklist
Administrative Information
Medical Facility Information
Field Service Engineer Information
Hospital or Clinic Name: FSE name:
Date Installation Start/Complete:
GE assigned system ID# (Where applicable)
Workstation Software Version and Build#:
MCB Software Version and Build#:
Workstation Serial Number:
External Inspection
Cabling and Connector inspection
Interconnect Cable and Connector
Workstation Inspection Mainframe Inspection
Problem and resolution
noted in comments section
Physical Location
Problem and resolution
noted in comments section
Label Inspection Internal Inspection
Power Supply Adaption UPS Setup System Power On
System Configuration in Admin Interface DICOM Setup and Check
Workstation Checks C-Arm Checks
Mechanical Movement :
Workstation Operation:
Pass Fail
Pass Fail
Mechanical Movement:
Key Switch:
C-Arm Controls:
Emergency Switch:
Pass Fail
Pass Fail
Pass Fail
Yes No