EasyManua.ls Logo

GE Brivo OEC 715 - Ma Measurement and Calibration; Ma Measurement and Accuracy Check

GE Brivo OEC 715
551 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Calibration
4-9
4.3. mA Measurement and Calibration
4.3.1. mA Measurement and Accuracy Check
Perform monoblock Warm-up procedure per Section 4.5 if monoblock is not powered
for more than 3 months or new monoblock FRU installed. If the FDB board (PN: 5085604)
is replaced at the same time, perform following mA Measurement and Accuracy Check
directly instead of monoblock Warm-up.
Ensure power on the system for 5 minutes to perform following mA Measurement and
Accuracy Check.
1. Remove the cover of the C-arm console and the cover of E-Box. install MCB board with extend
board.
2. Remove the J46 jumper on extend board. Connect the probes of ampere meter to TP222 (+) and
TP210 (-) on extend board.

Table of Contents

Other manuals for GE Brivo OEC 715

Related product manuals