CM
7. END TO END TESTS 35
8. ON-LOAD CHECKS 36
9. FINAL CHECKS 37
10. COMMISSIONING TEST RECORD 38
10.1 Peripheral Units: P742/P743 38
11. SETTING RECORD 46
11.1 Central Unit: P741 46
11.1.1 Relays Setting configuration 46
11.1.2 Disturbance recorder settings 48
11.1.3 Control and support settings 49
11.1.4 Protection settings 56
11.2 Peripheral Units: P742/P743 59
11.2.1 Relays Setting configuration 59
11.2.2 Disturbance recorder settings 61
11.2.3 Control and support settings 63
11.2.4 Protection settings 70