2.1 Arrangements Work Flow
17
2
Getting ready to start the test.
Testing
Arrangements Chapter 2
2.1 Arrangements Work Flow
1
2
3
4
ON
<Ex.>
Without Contact Check
Tested object
"Connecting the Protective Conductor Terminal" (p. 18)
"Connecting the Power Cord" (p. 19)
"Connecting the Test Lead" (p. 20)
"Turning the Power On and Off" (p. 24)
"Pre-test Check" (p. 26)
1
2
3
4
5
To carry out a safer test
• The Remote Control Box to start or stop the test can be used.
"Appendix1 Remote Control Box" (p. A1)
•
The instrument can be controlled with EXT I/O, RS-232C or GP-IB (only
for 3174-01).
"Chapter 8 External Interface" (p. 103)
"Chapter 9 RS-232C/GP-IB Interface" (p. 121)