4.1 Setting the Test Conditions
54
Time during which screening is not performed from the start of a test (delay time)
can be set. This is effective when a tested object contains a capacity component.
4.1.4 Setting the Delay Time
1.
Press the key to move the flashing cursor to the test-time timer.
2.
Press the key again to display the delay time setting screen.
Setting range: 0.1 to 99.9 s (The value changes by 0.1 s.)
To change the value by 1 s, while holding down the SHIFT key, press /
keys.
If no delay time is required, set it to “OFF” using the ON/OFF key.
3.
Press the STOP key to complete the setting value.
The instrument reverts to the READY state.
To continue to the setting for the next item, press the key.
or
<Ex.> Set to 0.1 s.
STOP
• After the delay time is set, if it is turned OFF and turned ON again using the
ON/OFF key, the delay time returns to the value set before OFF.
• Screening is not conducted for insulation-resistance tests when the test time
timer is set to OFF. However, if "Evaluate even for forced termination of test"
(p. 88) for an optional function is set, evaluation will be carried out when test is
forcibly terminated.
• When some capacity properties are included to the tested object, it may take
time for the measurement value to be stabilized. Set the delay time appropri-
ately to allow the ample time for the measurement value to stabilize.