CHAPTER 6
Preparation Overview
Site Preparation Checklist for EX3200 Switches on page 57
Environmental Requirements and Specifications for EX Series Switches on page 58
General Site Guidelines on page 62
Site Electrical Wiring Guidelines on page 63
Rack Requirements on page 64
Cabinet Requirements on page 65
Requirements for Mounting an EX3200 Switch on a Desktop or Wall on page 65
Clearance Requirements for Airflow and Hardware Maintenance for EX3200
Switches on page 66
Site Preparation Checklist for EX3200 Switches
The checklist in Table 31 on page 57 summarizes the tasks you need to perform when
preparing a site for EX3200 switch installation.
Table 31: Site Preparation Checklist
DatePerformed byFor More InformationItem or Task
Environment
“Environmental Requirements and
Specifications for EX Series Switches”
on page 58
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
“Power Specifications for EX3200
Switches” on page 69
Calculate the power consumption and
requirements.