EasyManua.ls Logo

LSIS LSLV-S100 - Cable Wiring

LSIS LSLV-S100
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
Installing the Inverter
3 Connect the cables to the power terminals and the control terminals. For cable specifications,
refer to 1.5 Cable Selection on page 10
.
5.5
22kW (3-phase)
1 Loosen the bolt that secures the front cover. Then remove the cover by lifting it from the
bottom and away from the front.

Table of Contents

Other manuals for LSIS LSLV-S100

Related product manuals