196
3.7.2 OUTRIGGER STOWAGE OPERATION
Before setting outriggers, read “OPERATION 2. 24 OUTRIGGER SETTING OPERATION”
and also the precautions described there.
The following explains the setting procedure for only one
outrigger (4). Repeat the same procedure for the other
three outriggers.
1. See “OPERATION 3.4 STARTING/STOPPING THE
ENGINE” to start the engine.
2. Set the mode selector switch (5) for the transmitter to
Outrigger (F) or (R).
• Outrigger (F) operates outriggers (1) and (4).
• Outrigger (R) operates outriggers (2) and (3).
NOTES
When operating by radio controller, the 4 outriggers
cannot be operated at the same time. Nor can the front
and rear outriggers.
3. Make sure that the crane stowage lamp (1) on the
monitor is lit in yellow.