Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 8 3 302 690 en Operating manual
GMK4100L-1
23.11.2017
7. For on-road driving with a dolly:
– Set down the superstructure on a dolly with the RCL adjusted accord-
ingly and switch on the boom floating position;
à p. 6 - 15,
– Switch on slewing gear freewheel;
à p. 6 - 14
– Switch on boom pre-tensioning if necessary;
à p. 6 - 16,
– Switch off the houselock;
à p. 11 - 17,
– Unrig the counterweight on the
rear counterweight platform;
à p. 12 - 74.
8. Turn off the engine for crane operation;
à p. 10 - 11.
9. If necessary, remove the anemometer and air traffic control light;
à Anemometer and air traffic control light, p. 12 - 126.
10. If necessary, remove the camera from the main boom;
à Cameras for crane operation, p. 12 - 132.
11. Fold in all mirrors for crane operation;
à Folding the mirrors in and out,
and adjusting them
, p. 12 - 130.
Slew the slewable spotlights to point downwards;
à p. 11 - 130.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK4100L-1 and is the answer not in the manual?

Manitowoc Grove GMK4100L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK4100L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals