Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual 3 302 690 en 12 - 9
GMK4100L-1
23.11.2017
12. Retract the step; à p. 12 - 137.
13. Retract the outriggers;
à CHECKLIST: Retracting the outriggers,
p. 12 - 41.
14. Switch on suspension (release locking) – symbol green (suspension
on);
à p. 5 - 17.
15. Switch off the engine
16. When the truck crane is no longer being used;
à In case of work breaks
of more than 8 hours
, p. 11 - 150.

Table of Contents