EasyManuals Logo

MG MGB User Manual

MG MGB
417 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #359 background imageLoading...
Page #359 background image
R.10
MGB.
Issue2. 69615
Section K.AA
PAINT
REFINISHlNG
INSTRUCTIONS
Operation
Material Thinning
Drying
times
Application
Instructions
Stripping
original
paint
Metal abrading
Acid etching
Priming
Applying
stopper
Filling
Water-soluble
paint
remover, e.g.
Sunbeam
Anti-corrosives
Stripolene
799
Emery-cloth,
e.g.
Howarth
Blue Twill,
grade 11/2
M
Apply
Deoxidine
125
(I.C.I.)
Synthetic
primer
G.I.P.
No.
S3178
or
Grey
cellulose
primer
G.I.P.
C3971
MOD
Stopper
Grey
G.I.P.
824D
or
Stopper
Brown
G.I.P.
1543
Primer
Filler
Grey
G.I.P.
C3663M
1
part
Deoxidine,
1
part water
6
to
1 with
Z1048
50/50
with
2045M
5
0/
50 with
2045M
1xé-hour
to
4
hours
lA-hour
6-8 hours,
or
overnight if
possible
3-4
hours
Brush
Hand
or
disc
Brush
Spray
Spray
Glazing
knife
Spray
Remove
the
original finish
with
a
scraper
after
allowing
paint-strip
10
minutes
to
react
(repeat
if
necessary).
Wash
off
thoroughly
with cold
water,
rubbing with
wire
wool.
Dry. Blow
out
crevices
with compressed
air.
Strip
3
small
area
at
a
time
to
enable
correct
neutralizing
of the
stripper
Paper
thoroughly
to
ensure
satisfactory key.
Wipe
with cleaner
solvent
or
white
spirits
Apply solution
generously
and rub
in
with
wire
wool. Do
not
allow Deoxidine solution
to
dry off
before
the wash-off
operation.
Allow
approximately ve
minutes
to
complete
reaction.
Wash thoroughly
with
cold
water to
remove
all
traces
of
Deoxidine solution,
followed
by
a
hot
rinse.
Thoroughly
dry
surfaces
with
a
clean cloth
and blow
out
crevices
with compressed
air
Apply
one
thin
coat
of synthetic
primer
(recommended
for
superior
adhesion)
or one
thin
coat
of cellulose
primer
(recommended
for
good
adhesion).
The
use
of
a
primer
coat
enhances
adhesion
and
gives
the
system
a
much
greater
safety
factor.
Apply
stopper in
thin
layers,
allowing
15~20
minutes’
drying
between
applications.
Heavy
layers
result
in
insufcient
drying,
with
subsequent
risk of
cracking
Apply
two
or
three
full
coats,
allowing
15—25
minutes’ drying
time
between
coats.
THE
BODY
’—

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MG MGB and is the answer not in the manual?

MG MGB Specifications

General IconGeneral
BrandMG
ModelMGB
CategoryAutomobile
LanguageEnglish

Related product manuals