EasyManua.ls Logo

NEC Univerge SV9100

NEC Univerge SV9100
766 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 2.0
SV9100 Networking Manual 10-3
SECTION 2 SV9100 REQUIREMENTS
2.1 Hardware
Each SV9100 Communications Server needs the following items:
GCD-CP10
GPZ-IPLE
Install the station/trunk blades as required for your configuration.
When installing a Secondary System in a NetLink network, and the Secondary
System has GCD-LCA blades, the GCD-LCA blades will come online and get
assigned ports before any GCD-DLCA blades.
Invalid data is displayed in the LCD of the terminal if Program 51-01 is enabled.
The VOIPDB daughter boards in the network do not need to have the same
capacity. However, any chassis which may be used as a Primary must have a
VOIPDB large enough to handle the required network resources. It is
recommended with this feature that the VOIPDB be the same as the largest
installed VOIPDB in the network.
2.2 Capacity
A maximum of 50 nodes (connected sites).
960 Extensions/400 Trunk ports (as allowed by hardware and licensing).
The maximum number of ports, receivers, conference groups, etc., is the same
as stand-alone communication server.
2.3 License
A NetLink License is required for the Primary System.
All licenses must be registered into the Primary System.
Refer to Section 10 Licensing Control for more details.
2.4 Protocol
TCP/IP IPv4 (IPv6 available in a future release)
2.5 Determining System ID
NetLink allows connecting a maximum of 50 communication servers. To identify
the communication server, each communication server must have one unique
number between 1 and 50.

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals