FCC/IC 5.4/5.3 GHz Link Activation Appendix J
WinLink™ 1000 User Manual Release 1.9 J-3
6. Enter the Link ID and note it for use with the second site of the link.
7. Check the Master radio button.
8. Click OK. The following window appears:
Figure J-3: The local ODU after activation - Probing
Notice that the Link ID is shown in the Link name pane.
9. Repeat the above procedure for the remote ODU, ensuring that in the Air
Interface window, that you enter exactly the same Link ID, but this time
that you check the Slave radio button.
If both ODUs are powered up, after a minute or so a link will be estab-
lished. If you are still connected to the remote site (from the previous
steps), the window of Figure J-3 will look like this: