tnemhcattAsrellortnoC evirD 30EVIRDOCE 16-1
16 Attachment
16.1 Sizing relevant to supply and regeneration
Requirements
Note: When sizing the drive, you must check and observe the
conditions relevant to supply and regeneration mentioned
below.
(Energy ux from supply system to installation)
unitsZWD,systemZWD, PP ≤
PZWD,system : required DC bus continuous power of the system
P
ZWD,units : allowed DC bus continuous power of the units
Fig. 16-1: DC bus continuous power
unitsZWS,systemZWS, PP ≤
PZWS,system : required DC bus peak power of the system
P
ZWS,units : allowed DC bus peak power of the units
Fig. 16-2: DC bus peak power
(Energy ux from installation to DC bus)
unitsRD,systemRD, PP ≤
PRD,system : required continuous regenerative power of the system
P
RD,units : allowed continuous regenerative power of the units
Fig. 16-3: Continuous regenerative power
unitsRS,systemRS, PP ≤
PRS,system : required peak regenerative power of the system
P
RS,units : allowed peak regenerative power of the units
Fig. 16-4: Peak regenerative power
unitsR,systemR, WW ≤
W R,system : required regenerative power of the system
W
R,units : allowed regenerative power of the units
Fig. 16-5: Regenerative power
Requirements for supply
operation:
Requirements for regenerative
operation:
customerservice@hyperdynesystems.com | (479) 422-0390