EasyManua.ls Logo

RKI Instruments GX-6000 - Page 253

RKI Instruments GX-6000
262 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GX-6000 Operator’s Manual Calibrating the 10.0 eV/Benzene PID Sensor • 244
b. Press and release the POWER/ENTER button. The current
concentration will be shown and it will be flashing.
c. Use AIR or SHIFT (PANIC) to adjust the concentration.
d. Press and release the POWER/ENTER button to save it.
9 . Screw the demand flow regulator onto the benzene calibration cylinder.
10 . Attach the calibration tubing to the demand flow regulator.
11 . Attach the other end of the calibration tubing to the tube holder’s inlet
fitting.
12 . Use the SHIFT (PANIC) button to place the cursor next to START
CAL.
13 . Press and release the POWER/ENTER button to start a calibration. An
automatically-determined, temperature-based countdown is displayed at
the bottom of the screen. The number to the left of the countdown (“5” in
the example below) is the temperature code.
14 . If the calibration passes, the screen will indicate PASS and will return
you to the TUBE CAL Auto Calibration Menu.
TUBE CAL
CONCENTRATION
BNZ 5.00 ppm
APPLYGAS
BNZ
5 45SEC
0.00
ppm

Table of Contents

Other manuals for RKI Instruments GX-6000

Related product manuals