EasyManua.ls Logo

Stryker Neptune 2 - Page 56

Stryker Neptune 2
232 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Remove the grey cable labeled small canister PCBA from the connector on the
canister calibration PCBA (P/N 0702-001-803) (Behind Canister).
8. Remove the coupling clips on the large canister at the water and vacuum ports.
2-27

Table of Contents

Other manuals for Stryker Neptune 2

Related product manuals