EasyManuals Logo

Stryker Neptune 2 Service And Installation Manual

Stryker Neptune 2
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #63 background imageLoading...
Page #63 background image
8. Carefully lift the small canister assembly (P/N 702-1-300) (AK) out and set aside. Be
mindful of any fluid that may remain in the drain valve assembly.
9. The large canister can be accessed by removing the large v-clamp (P/N 0702-001-
324) (AJ) and then removing the large canister cap assembly (P/N 0702-001-220)
(AH) from the large canister assembly (P/N 0702-001-320) (AD).
2-34

Table of Contents

Other manuals for Stryker Neptune 2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Stryker Neptune 2 and is the answer not in the manual?

Stryker Neptune 2 Specifications

General IconGeneral
BrandStryker
ModelNeptune 2
CategoryMedical Equipment
LanguageEnglish

Related product manuals