EasyManua.ls Logo

Waters GCT Premier - Page 159

Default Icon
382 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Controlling the DI probe temperature 7-15
To create probe ramping data:
1. Type the required initial ramp value in the Value field, then press
Enter.
Result: The value is entered in the field, and the focus moves to the
Hold field.
2. Type the required start time for the ramp in the Hold field, then press
Enter.
Result: The value is entered in the field, and a new line is created, with
the focus in the Rate field.
3. Type the required value in the Rate field, then press Enter.
4. Repeat steps 1 through 3 for the Value and Hold fields. When Enter is
pressed for the Hold field, a new row (Ramp 2) is created.
5. Repeat steps 3 and 4 as required to create additional probe ramps.
To edit probe ramping data:
1. Double-click the text box to be edited.
2. Type the new value in the box.
3. Press Enter.
4. Repeat steps 1 through 3.

Table of Contents