6.2 Inspections and Confirmations before Trial Operation
6-3
6.2 Inspections and Confirmations before Trial Operation
To ensure safe and correct trial operation, check the following items before you start trial oper-
ation.
Make sure that the SERVOPACK and Servomotor are installed, wired, and connected cor-
rectly.
Make sure that the correct power supply voltage is supplied to the SERVOPACK.
Make sure that there are no loose parts in the Servomotor mounting.
If you are performing trial operation on a Servomotor that has been stored for a long period of
time, make sure that all Servomotor inspection and maintenance procedures have been com-
pleted.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YASKAWA E-S Series and is the answer not in the manual?

YASKAWA E-S Series Specifications

General IconGeneral
BrandYASKAWA
ModelE-S Series
CategoryServo Drives
LanguageEnglish

Related product manuals