EasyManua.ls Logo

ABB RELION Series - Technical Revision History

ABB RELION Series
804 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9.1.9 Technical revision history
Table 639: CBXCBR Technical revision history
Technical revision
Change
B Interlocking bypass input (ITL_BYPASS) and
opening enabled (OPEN_ENAD)/closing enabled
(CLOSE_ENAD) outputs added. ITL_BYPASS
bypasses the ENA_OPEN and ENA_CLOSE states.
C
Internal improvement.
D Added inputs TRIP and SYNC_OK. Renamed input
ITL_BYPASS to SYNC_ITL_BYP. Added outputs
CL_REQ and OP_REQ. Outputs OPENPOS and
CLOSEPOS are forced to “FALSE” in case status is
Faulty (11).
Table 640: DCXSWI Technical revision history
Technical revision Change
B Maximum and default values changed to 60 s and
10 s respectively for "Event delay" settings.
Default value changed to 30 s for "Operation
timeout" setting.
C
Outputs OPENPOS and CLOSEPOS are forced to
“FALSE” in case status is Faulty (11).
9.2 Disconnector position indicator DCSXSWI and
earthing switch indication ESSXSWI
9.2.1 Identification
Function description
IEC 61850
identification
IEC 60617
identification
ANSI/IEEE C37.2
device number
Disconnector position indication DCSXSWI I<->O DC I<->O DC
Earthing switch indication ESSXSWI I<->O ES I<->O ES
9.2.2 Function block
A071280 V2 EN
Figure 312: Function block
1MRS758755 A Section 9
Control functions
REC615 and RER615 613
Technical Manual

Table of Contents

Other manuals for ABB RELION Series

Related product manuals