EasyManua.ls Logo

Alcatel-Lucent 7360 - Page 648

Alcatel-Lucent 7360
1073 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NTP 112 — Install a G-010V-P ONT
NTP 112-4 November 2013 Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
Edition 01 3FE 55873 AAAA TCZZA
ONT Product Information Guide
7 Connect the SC/APC fiber optic cable (DLP 125).
8 Optionally, install the power supply according to manufacturer specifications and
connect the power cable to the ONT. The unit receives reverse power through the
VDSL line.
9 Verify the ONT LEDs, voltage status, and optical signal levels (DLP 127).
10 Activate and test the services (DLP 128).
11 If used, configure the SLID (DLP 129).
12 STOP. This procedure is complete.
Caution — Units must be powered by a Listed or CE approved and
marked limited power source power supply with a minimum output rate
of 12 V dc, 1.25 A.

Table of Contents

Related product manuals