EasyManua.ls Logo

Alcatel-Lucent 7360 - NTP 113-2: G-010 V-P ONT Installation

Alcatel-Lucent 7360
1073 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NTP 113 — Replace a G-010V-P ONT
NTP 113-4 November 2013 Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
Edition 01 3FE 55873 AAAA TCZZA
ONT Product Information Guide
5 Connect the VDSL cables to the ONT.
i Connect the VDSL line from the CPE to the VDSL port using an RJ-45
connector, as shown in Figure NTP 113-1. Reverse power is provided to the
ONT through this connection using a PSE injector located on the customer
premises, as show in Figure NTP 113-2.
Figure NTP 113-2: G-010V-P ONT installation
ii Connect the VDSL line from the central office to the CO LINE port using an
RJ-45 connector. This line will be used only if the unit is not powered by the
CPE VDSL line.
6 If required, have approved service personnel who are trained to work with optic
fiber clean the fiber optic connection. See DLP 134 for more information about
fiber optic handling, inspection, and cleaning.
7 Connect the fiber optic cable to the ONT.
i Route the fiber optic cable to the ONT.
ii Plug the SC/APC adaptor into the fiber optic port (DLP 125).
Danger — Fiber optic cables transmit invisible laser light. To avoid eye
damage or blindness, never look directly into fibers, connectors, or
adapters.
23852
G-010V-P
OLT
Power
insertion
module
PSU
(PoE)
L
P
W
R
R
P
W
R
P
O
N
V
D
S
L
ALM
Customer
equipment
(
VDSL2)
Technical Area Customer Premises

Table of Contents

Related product manuals