EasyManua.ls Logo

arcelik Beko B13 - Step Nr. 11: Detergent Box Control and Detergent Box Siphon Control; Step Nr. 12: Hot Water Valve Control; I F Not, Next Step will be Switched to ); Explanation

arcelik Beko B13
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B13 BETTER (B13 BEST APPEARANCE) WASHING MACHINE SERVICE HANDBOOK
92
10.12. Step nr. 11: Detergent box control and Detergent box siphon control
Explanation:
Prewash valve and main wash valve are driven together.
Indicators on the interface:
"Test" is displayed on the remining time indicator.
Condition to switch to the next step:
It takes water until "Start / Pause" button is pressed or up to the overflow level.
Timeout: If “Start/Pause” button is not pressed in 2 minutes, "OFF" mode is started.
Switching to the next step:
“Start / Pause” button is pressed.
NOTE : If "ON/OFF" button is pressed for 3 seconds, machine goes to "OFF" mode.
10.13. Step nr. 12: Hot water valve control
(This step will be performed if there is Hot Water input on the machine. If
not, next step will be switched to)
Explanation:
Hot water valve is driven (If there is Hot Water Valve).
Indicators on the interface:
"Test" is displayed on the remining time indicator.
Condition to switch to the next step:
It takes water until "Start / Pause" button is pressed or up to the overflow level.
Timeout: If “Start/Pause” button is not pressed in 2 minutes, "OFF" mode is started.
Switching to the next step:
“Start / Pause” button is pressed.
NOTE : If "ON/OFF" button is pressed for 3 seconds, machine goes to "OFF" mode.

Table of Contents

Related product manuals