EasyManua.ls Logo

Automation Direct DURApulse GS4 - Page 426

Automation Direct DURApulse GS4
542 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page A–30
DuRApulse GS4 AC Drive User Manual – 1st Ed, Rev A - 10/20/2017
Appendix A: Accessories
Frame G Conduit Box Installation (continued)
Fasten all the screws. Screw torque: 24~26 kg·cm (20.8~22.6 Ib·in).
Place the cover back to the top and fasten the screws (as shown in the figure).
Screw torque: 12~15 kg·cm (10.4~13 Ib·in).
Remove poWeR fRom dRIve pRIoR to INstAllAtIoN ANd/oR RemovAl of AccessoRIes.

Table of Contents

Other manuals for Automation Direct DURApulse GS4

Related product manuals