EasyManua.ls Logo

Automation Direct DURApulse GS4 - Conduit Box Installation - Frame G

Automation Direct DURApulse GS4
542 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix A: Accessories
Page A–29
DuRApulse GS4 AC Drive User Manual – 1st Ed, Rev A - 10/20/2017
ConduiT box insTallaTion – frame g
On the conduit box, loosen 7 of
the cover screws and remove
the cover, as shown.
Screw torque:
24~26 kg·cm (20.8~22.6 lb·in)
On the drive, loosen 4 of the
cover screws to remove the
cover, as shown.
Screw torque:
12~15 kg·cm (10.4~13 Ib·in).
Remove the top
cover and loosen
the screws, as
shown.
Screw torque:
M5:
24~26 kg·cm
(20.8~22.6 lb·in)
M8:
100~120 kg·cm
(86.7~104.2 lb·in)
Install the conduit box by fastening all the
screws shown.
Screw torque:
M5:
24~26 kg·cm (20.8~22.6 lb·in)
M8:
100~120 kg·cm (86.7~104.2 lb·in)
Remove poWeR fRom dRIve pRIoR to INstAllAtIoN ANd/oR RemovAl of AccessoRIes.

Table of Contents

Other manuals for Automation Direct DURApulse GS4

Related product manuals