Contents
10 SI Installation and Upgrades
June 2004
Register the Switch for Maintenance [from R5/R6/R7/R8si] 127
Check link status [from R5/R6/R7/R8si] 130
Power up DEFINITY LAN Gateway system [from R5/R6/R7/R8si] 130
Power up DEFINITY AUDIX system [from R5/R6/R7/R8si] 130
Resolve alarms [from R5/R6/R7/R8si] 131
Run acceptance tests [from R5/R6/R7/R8si] 131
Test single-carrier cabinet systems 132
Test multi-carrier cabinet systems 132
Test telephones and other equipment 132
Restore announcements (TN750 or TN750B only) [from R5/R6/R7/R8si] 133
Rerecord announcements [from R5/R6/R7/R8si] 133
Check SPE [from R5/R6/R7/R8si] 133
Save announcements and translation [from R5/R6/R7/R8si] 134
Return equipment [from R5/R6/R7/R8si] 134
Helpful links 134
G3V4vs/R5vs/R6vs to
Avaya Communication Manager 135
• Introduction 135
When to use the TN2401 versus the TN2401/2400 sandwich pack 135
Before you begin the upgrade 136
Preparation and process steps 137
Make the Blowback Tape 139
• Task List: DEFINITY vs to Avaya Communication Manager 140
Verify the required hardware [from G3V4vs/R5vs/R6vs] 141
Provide the required tools [from G3V4vs/R5vs/R6vs] 142
Go to the RFA website 143
G3V4 through Release 9si upgrades only 144
Direct connection between the switch and RFA 144
No connection between the switch and RFA 144
If you have problems with RFA 144
Pre-upgrade administration [from G3V4vs/R5vs/R6vs] 145
Unpack and inspect control cabinet [from G3V4vs/R5vs/R6vs] 146
Install new control cabinet [from G3V4vs/R5vs/R6vs] 147
Install new control cabinet with earthquake
protection [from G3V4vs/R5vs/R6vs] 147
Label and connect cables [from G3V4vs/R5vs/R6vs] 149
Install TDM/LAN bus terminators [from G3V4vs/R5vs/R6vs] 150