Contents
SI Installation and Upgrades 11
June 2004
Swing existing system into maintenance
position [from G3V4vs/R5vs/R6vs] 150
Check existing software load [from G3V4vs/R5vs/R6vs] 151
Verify system status [from G3V4vs/R5vs/R6vs] 151
Disable scheduled maintenance and alarm
origination [from G3V4vs/R5vs/R6vs] 152
Check link status [from G3V4vs/R5vs/R6vs] 152
Record all links and remove only ISDN
interface links [from G3V4vs/R5vs/R6vs] 153
Save translation [from G3V4vs/R5vs/R6vs] 154
Save recorded announcements (TN750B) [from G3V4vs/R5vs/R6vs] 154
List configuration software version [from G3V4vs/R5vs/R6vs] 155
Shut down DEFINITY LAN Gateway system [from G3V4vs/R5vs/R6vs] 155
Shut down the DEFINITY AUDIX system [from G3V4vs/R5vs/R6vs] 156
Power down existing system [from G3V4vs/R5vs/R6vs] 156
Remove ground connections [from G3V4vs/R5vs/R6vs] 157
Move 25-pair cables from G3V4vs System from G3V4vs/R5vs/R6vs 157
Move management terminal cable from G3V4vs/R5vs/R6vs 157
Move circuit packs from G3V4vs/R5vs/R6vs 158
Verify TDM cables and connectors [from G3V4vs/R5vs/R6vs] 158
Connect control cabinet power and ground [from G3V4vs/R5vs/R6vs] 158
Power up [from G3V4vs/R5vs/R6vs] 159
Deliver or install the License File [from G3V4vs/R5vs/R6vs] 160
New Duplicated G3r installations only 160
New simplex and upgraded G3r only 161
New or upgraded G3si only 161
Direct connection between the switch and RFA 162
No connection between the switch and RFA 162
Administer No-License/Emergency Numbers [from G3V4vs/R5vs/R6vs] 162
Set Daylight Savings rule [from G3V4vs/R5vs/R6vs] 163
Check customer options [from G3V4vs/R5vs/R6vs] 163
High or Critical Reliability 163
All 163
Verify the upgrade [from G3V4vs/R5vs/R6vs] 164
Restore busyouts [from G3V4vs/R5vs/R6vs] 164
Run acceptance tests [from G3V4vs/R5vs/R6vs] 165
Test single-carrier cabinet systems 165
Test multi-carrier cabinet systems 165
Test telephones and other equipment 166