Contents
12 SI Installation and Upgrades
June 2004
Enable Scheduled Maintenance and Alarm
Notification [from G3V4vs/R5vs/R6vs] 166
Register the switch for maintenance [from G3V4vs/R5vs/R6vs] 167
Restore announcements [from G3V4vs/R5vs/R6vs] 169
Rerecord announcements [from G3V4vs/R5vs/R6vs] 170
Save announcements and translation [from G3V4vs/R5vs/R6vs] 170
Disassemble the G3V4vs System [from G3V4vs/R5vs/R6vs] 171
Return equipment [from G3V4vs/R5vs/R6vs] 172
Helpful links 172
AC-powered cabinet port carrier power upgrade compatibility 173
Alarm connections 175
Redistribution methods 175
Results of ganging method 175
Port-network configurations 175
Install Fiber Optic Cable Pass-Thru Kit
for MCC1 (Multicarrier) Cabinets 177
• Install the fiber optic cable pass-thru kit (MCC1) 177
LASER Product 177
Install Fiber Optic Cable Pass-Thru Kit for
SCC1 (Single-Carrier) Cabinets 193
• Install the fiber optic cable pass-thru kit (SCC1) 193
LASER Product 193
• Administering Fiber Optic Cables 210
Fiber Link Administration Form 210
Administration commands 210
PN reliability configurations 211
Simplex PNC 211
• Task List: Administration Details 211
• Administering PNC Duplication 212
• Administering Fiber Links 212
• Duplicated Fiber Link Administration 213
• DS1C Converter Complex Administration for TN574 Circuit Packs 214
• Duplicated DS1C Converter Complex Administration for TN574 Circuit Packs 218
• DS1 Converter Complex Administration for T1 TN1654 Circuit Packs 219
• Duplicated DS1 Converter Complex Administration for T1 TN1654
Circuit Packs 220