EasyManua.ls Logo

Avaya MCC1 - Page 12

Avaya MCC1
874 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents
12 SI Installation and Upgrades
June 2004
Enable Scheduled Maintenance and Alarm
Notification [from G3V4vs/R5vs/R6vs] 166
Register the switch for maintenance [from G3V4vs/R5vs/R6vs] 167
Restore announcements [from G3V4vs/R5vs/R6vs] 169
Rerecord announcements [from G3V4vs/R5vs/R6vs] 170
Save announcements and translation [from G3V4vs/R5vs/R6vs] 170
Disassemble the G3V4vs System [from G3V4vs/R5vs/R6vs] 171
Return equipment [from G3V4vs/R5vs/R6vs] 172
Helpful links 172
AC-powered cabinet port carrier power upgrade compatibility 173
Alarm connections 175
Redistribution methods 175
Results of ganging method 175
Port-network configurations 175
Install Fiber Optic Cable Pass-Thru Kit
for MCC1 (Multicarrier) Cabinets 177
Install the fiber optic cable pass-thru kit (MCC1) 177
LASER Product 177
Install Fiber Optic Cable Pass-Thru Kit for
SCC1 (Single-Carrier) Cabinets 193
Install the fiber optic cable pass-thru kit (SCC1) 193
LASER Product 193
Administering Fiber Optic Cables 210
Fiber Link Administration Form 210
Administration commands 210
PN reliability configurations 211
Simplex PNC 211
Task List: Administration Details 211
Administering PNC Duplication 212
Administering Fiber Links 212
Duplicated Fiber Link Administration 213
DS1C Converter Complex Administration for TN574 Circuit Packs 214
Duplicated DS1C Converter Complex Administration for TN574 Circuit Packs 218
DS1 Converter Complex Administration for T1 TN1654 Circuit Packs 219
Duplicated DS1 Converter Complex Administration for T1 TN1654
Circuit Packs 220

Table of Contents