Contents
14 SI Installation and Upgrades
June 2004
Installation for MCC1
(Multicarrier Cabinets) Made Easy 325
Install and Connect MCC1
(Multicarrier) Cabinet 327
• Task List: Install and Connect MCC1 327
Install Concrete Floor Mounting 331
Install Raised Computer Floor Mounting 332
• Connect AC Power and Ground 334
• Task List: Connect AC power and ground 335
Power Requirements 335
Power Supply Sources (J58890CE-1, J58890CE-2, and J58890CH-1) 335
Grounding an AC-Powered System (J58890CE) 336
• Connect DC Power and Ground 343
• Task List: Connect DC Power and Ground 343
• Connect Fiber Optic Interconnect Cabling 356
(Single Carrier Cabinets) Made Easy 361
Install and Connect SCC1
(Single-Carrier Cabinets) 363
• Task List: Install and Connect Single-Carrier Cabinets (SCC1) 363
• Ground DC-Powered Cabinets 370
• Task List: Connect the cabinet grounds on the J58890R DC Power Cabinet
and the Single-Carrier Cabinets 370
• Connect DC Power 374
• Task List: Connect the DC power 374
Making DC Power Connections 375
• Task List: Install a J58890CG DC Power Distribution Unit 375
DC Power Connections with DC Distribution Unit 376
Stacking DC Power Cabinets 376
• Ground and Connect AC-Powered Cabinets 382
• Task List: Connect the cabinet grounds on the J58890R DC Power Cabinet
and the Single-Carrier Cabinets 382
• Connect Time Division Multiplexing Bus Cables 385