EasyManua.ls Logo

Avaya MCC1 - Page 15

Avaya MCC1
874 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents
SI Installation and Upgrades 15
June 2004
Install Telecommunications Cabling 403
Information about Installing the Cabling 403
Task List: Installing the Telecommunications Cabling 403
Provisioning Plan 404
Main Distribution Frame (MDF) Hardware 404
MDF Cross-Connect Fields 406
Main Distribution Frame 408
Main Distribution Frame Labels 409
Off-Premises Circuit Protection 410
Sneak Fuse Panels 411
Cable Installation 411
Equipment Room Cabling Labels 412
Cable Routing Guidelines 412
Control Carrier Outputs Cable Installation 413
Trunk Cables Among Network Interface, Sneak Fuse Panel, and Cabinet 413
Coupled Bonding Conductor 415
Installation Space Requirements 416
Sneak Fuse Panels and Emergency Transfer Units 416
110-Type Hardware 416
Cable Slack Manager 416
Station Wiring Design 417
Information Outlets 417
Station Cables 417
Closets 418
Site Locations 418
Satellite Locations 419
Satellite Locations Using 110-Type Hardware 419
Station Circuit Distribution from Equipment Room 421
4-Pair Station Circuits 421
3-Pair to 4-Pair Station Circuit Distribution 421
Voice and Data Terminals 425
Connectable Administration Terminals 427
Layout 427
Information Outlet Locations 427
Site, Satellite, and Adapter Locations 427
Sizing 4-Pair Station Cables 428

Table of Contents