Contents
16 SI Installation and Upgrades
June 2004
Sizing 25-Pair and Multiple 25-Pair Station Cables 428
3-Pair Station Cable Circuits 428
4-Pair Station Cable Circuits 428
• Patch Cord/Jumper Installation and Administration 429
Bring the System Online 447
• Task List: Setting up the PC and Administering the System 447
• About Accessing the System 448
• Administration Screens and Commands 448
• Administering the Circuit Packs 449
Administration Commands 449
Change Circuit Packs Form 450
Change Circuit Pack Form Implementation Notes 451
• DEFINITY AUDIX System Power Procedures 451
Manually Power Down AUDIX System 451
Manually Power Up AUDIX System 452
• Access the System 452
• Task List: Access the system 452
• Task List: Make Data Module Settings 452
• Activate the System 460
• Task List: Activate the System 461
• Administer the System 463
• Task List: Administer the System 464
New Duplicated G3r installations only 465
New simplex and upgraded G3r only 465
New or upgraded G3si only 465
Direct connection between the switch and RFA 466
No connection between the switch and RFA 466
Test the System 483
• Task List: Test the System 483
• LED Indicators 484
Attendant Console LEDs 484
Terminal Alarm Notification 484
Circuit Pack LEDs 485
DS1 Converter Circuit Pack LEDs 485