AUSTROMAT
®
664 iSiC
®
/ 674 baSiC
2
4. Start-up
Operating Instructions (Version 03/2018) 29
4.3. Installing the heating elements
The firing furnace is delivered with the heating elements removed. They were placed inside
separate boxes and have to be installed prior to the first startup.
How to install heating elements
DEKEMA has extended the portfolio on YouTube (Dekema Academy
®
,
"https://www.youtube.com/channel/UC80C1iRkrHY69XIEEGudx3w"). You find a huge range of
movies for application and service of DEKEMA devices.
The video for the assembly of the heating elements is available through the following link. You
can also request the videos from DEKEMA (address see p. 2).
• AUSTROMAT
®
664 iSiC
®
("https://www.youtube.com/watch?v=TFMwG1T8JTk")
• AUSTROMAT
®
674 baSiC
2
("https://www.youtube.com/watch?v=caA8T_mloYY")
NOTE:
Install the heating element wires with a huge distance to the heating elements itself, see
Fig. 4-2.
Fig. 4-2 Correct running of the heating element terminal wires
You have installed the heating elements.