EasyManua.ls Logo

Fluke 990DSL - Page 75

Fluke 990DSL
242 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
POTS Testing and Fault Location
The POTS Toolbox
4
4-11
Running a Continuous Voltage Test
To continuously monitor DC voltage on a pair, do the following:
1. Press A(
Contin. DCV).
The
Continuous DCV screen (Figure 4-5) is displayed.
acy16s.eps
Figure 4-5. Continuous Voltage Test Result Screen
Figure 4-5 shows a continuous DCV value for the T-R leg. The bar graph
plots real-time voltage variations against the reference (center) value of
the initial reading. Peak voltage excursions are recorded as half-tone
shaded portions of the bar, with excursions beyond the scale marked as
“Min” and “Max” values. The current reading is shown in large, solid
black numbers. Each scale mark on the bar graph corresponds to one unit
of measure (in this case, 1 volt) of the parameter.
2. To continuously test another leg, press B(
TG) or C(RG).
3. To re-center a reading that has drifted, press D(
Set New Reference).
4. To stop a continuous test, press K or M.

Table of Contents

Related product manuals