EasyManua.ls Logo

Fluke 990DSL - Load Coils Test

Fluke 990DSL
242 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
990DSL
Users Guide
4-34
3. With the strapping prompt screen displayed, press K.
This starts the second part of the K-Test, during which the tester
measures loop resistance and performs a nulling bridge operation on
the pair with the far-end shorted.
After completion, the tester displays resistances to the fault and strap,
as in the normal RFL process.
4. Press A (
Distance to Fault) to view distances, as is normally done.
Load Coils Test
The Load Coils test performs a frequency sweep of the pair (either spare or
working POTS) to determine the number of load coils present, and the
approximate distance to the first coil.
Setting Up a Load Coils Test
The Load Coils test requires that the predominant wire-gauge to the first load
coil be entered in Setups, for the most accurate distance-to-first-load results.
Load Coils Test Results
To run the Load Coils test, select the test on the POTS Toolbox and press K.
Figure 4-21 shows the results of a Load Coils test that was conducted on a pair
with six loads:

Table of Contents

Related product manuals