EasyManua.ls Logo

HOEFLON C30e - Lifting the Crane; Putting the Compact Crane in Storage

Default Icon
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11. Transport and storage
11.2 Lifting the crane
The C30e Compact crane has four lifting points for lifting the crane.
l
Two lifting points at the front of the boom,
l
Two lifting points at the rear of the boom.
They are identified by the "Lifting point" pictogram.
Make sure that your lifting equipment is properly rated.
Use four chains (capacity: at least 2500 kg per chain) to lift a crane.
Put the crane into transport position before lifting the crane (see 11.1.1 Put the crane in transport position)
11.3 Putting the compact crane in storage
1. Fully clean the compact crane.
2. Clean the track undercarriage with a pressure washer.
l
Do not point the pressure washer at electrical components.
3. Grease the compact crane (see 9.6 Lubrication)
4. Repair all damaged paintwork.
5. Apply a thin layer of grease to the parts that may rust.
152 U.C30e.00.00.EN Version

Table of Contents