Controller redundancy specifications
‘Go-Back to Idle’ option
R301.1 Experion C300 Controller User's Guide 209
11/06 Honeywell
Controller redundancy specifications
Specification
Control processing switchover interruption time
(
RDNSOTIMEMAX)
500 milliseconds
Initial synchronization time (from sync start to completion)
(
RDNISTIMEMAX)
200 seconds
Maximum elapsed time between commanded switchover and
completion of initial synchronization
300 seconds
Maximum elapsed time between switchover due to power
cycle of the primary and completion of initial synchronization
300 seconds
Maximum OPM control freeze time (
RDNOPMFRZTIME) 20 seconds