Load components from Project 
Loading CEEC300 
R301.1  Experion C300 Controller User's Guide  151 
11/06  Honeywell 
Step Action  Result 
 
TIP   
If errors are detected, they will be displayed in the Load progress dialog and you will 
be asked if you want to continue the load or cancel, depending on the nature of the 
error. We suggest that you cancel the load and identify and fix the errors. Each 
message includes an error code in parentheses. Note the last number in the string. In 
some cases, more information about the code number may be included in the Control 
Builder Notifications Reference document in Knowledge Builder. 
4 
Once the load completes and the dialog 
box closes, click the Monitoring tab.  
IOLINK icons now appear in Monitoring 
tab. The default state for a loaded 
IOLINK is active or color code green. 
5 
Repeat this procedure for other I/O 
interface components as required. 
 
 
Loading CEEC300 
Use the following general procedure to load a Control Execution Environment 
(CEEC300) block to a C300 Controller. The load procedure is similar for all control 
environment related components.  
Prerequisites 
•  Control Builder is running 
•  Make sure the C300 Controller block is loaded. 
•  This procedure assumes that the C300 Controller is installed and capable of 
communicating with the Server. 
Considerations 
All illustrations used in the procedure are for example purposes only. 
To load a CEEC300 block 
 
Step Action  Result 
1 
Click desired CEEC300 block icon in 
Project tab.  
Selects and highlights the component.