Keysight N9010A EXA Service Guide 351
Power Supply/Midplane Troubleshooting
A6 Power Supply Basic Troubleshooting (Cover On)
It is possible that some portion of the initial troubleshooting check may fail.
Chapter 2 should also be referenced if this is the case. As an example, the A15
Front End Control Assembly may be pulling down the +15 volt supply that is
used for the probe power on the front panel. Chapter 2 describes the entire
instrument boot process, from initial power on to a successful signal analyzer
sweep. If any portion of the boot process fails, Chapter 2 describes a
step-by-step troubleshooting procedure to help isolate the root cause of the
failure.

Table of Contents

Other manuals for Keysight Technologies X Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keysight Technologies X Series and is the answer not in the manual?

Keysight Technologies X Series Specifications

General IconGeneral
BrandKeysight Technologies
ModelX Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals