502 Keysight N9010A EXA Service Guide
Assembly Replacement Procedures
RF Area (Option 503, 507, 513, 526)
Replacement
1. Refer to Figure 15-31. Position the attenuator in the bracket so that the
ribbon connector end is “up”.
2. Replace the two screws that attach the attenuator to the bracket. Torque
to 9 inch-pounds.
3. Position the attenuator and bracket into the chassis and attach with the
two screws. Torque to 9 inch-pounds.
4. Replace the ribbon cable and semi-rigid cables W9, W10, W11, and W19
to the attenuator. Torque the semi-rigid cables to 10 inch-pounds.