EasyManua.ls Logo

Milestone ultraWAVE 3 - Maintenance after each Run

Milestone ultraWAVE 3
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Milestone Srl MA245-003 ultraWAVE 3 User Manual
13
Maintenance after each run
The base load must be replaced every run and the PTFE vessels must be removed from the
cavity.
Dry very well the steel cavity (inside and outside) and the clamps. Clean them using Ethanol.
Before turning off the unit, it is recommended to grease all the steel part of the reactor using a
small amount of oil or grease provided with the unit.
More detailed information concerning the operating steps and the maintenance can be found into the
next chapters of ultraWAVE 3 user manual.

Table of Contents

Related product manuals