EasyManua.ls Logo

Milestone ultraWAVE 3 - Pressure Load before the Microwave Run

Milestone ultraWAVE 3
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Milestone Srl MA245-003 ultraWAVE 3 User Manual
61
Close the clamp on the cover with the locking screw
At the end of the guided session the safety pin rises
to block the clamps before to load the pressure
Pressure load before the microwave run
The initial pressure is 40 bar, but this value may be different for some applications. For more details,
contact a Milestone application specialist.
Follow the below steps to load the gas into the reactor:
Open the high-pressure regulator to load the correct
pressure:
Direct connection: 40 bar
Pneumatic booster: 4 10 bar
o Booster compressed air: 3 6,5 bar
High pressure compressor: 5 6 bar

Table of Contents

Related product manuals